Please use this identifier to cite or link to this item: http://bura.brunel.ac.uk/handle/2438/4206
Title: Project pathogens: The anatomy of omission errors in construction and resource engineering project
Authors: Love, PED
Edwards, DJ
Irani, Z
Walker, DHT
Keywords: Error;Error management;Omission;Pathogens;Rework
Issue Date: 2009
Publisher: IEEE
Citation: IEEE Transactions in Engineering Management. 56 (3) 452-435
Abstract: Construction and engineering projects are typically complex in nature and are prone to cost and schedule overruns. A significant factor that often contributes to these overruns is rework. Omissions errors, in particular, have been found to account for as much as 38% of the total rework costs experienced. To date, there has been limited research that has sought to determine the underlying factors that contribute to omission errors in construction and engineering projects. Using data derived from59 in-depth interviews undertaken with various project participants, a generic systemic causal model of the key factors that contributed to omission errors is presented. The developed causal model can improve understanding of the archetypal nature and underlying dynamics of omission errors. Error management strategies that can be considered for implementation in projects are also discussed.
URI: http://bura.brunel.ac.uk/handle/2438/4206
ISSN: 0018-9391
Appears in Collections:Business and Management
Brunel Business School Research Papers

Files in This Item:
File Description SizeFormat 
n2006011669.pdf585.9 kBAdobe PDFView/Open


Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.