Please use this identifier to cite or link to this item: http://bura.brunel.ac.uk/handle/2438/396
Full metadata record
DC FieldValueLanguage
dc.contributor.authorCoughlan, JA-
dc.contributor.authorLycett, M-
dc.contributor.authorMacredie, RD-
dc.coverage.spatial28en
dc.date.accessioned2006-11-20T16:18:02Z-
dc.date.available2006-11-20T16:18:02Z-
dc.date.issued2003-
dc.identifier.citationInformation and Software Technology, 45(8): 525-537, Jun 2003en
dc.identifier.urihttp://bura.brunel.ac.uk/handle/2438/396-
dc.identifier.urihttp://www.ingentaconnect.com/content/els/09505849en
dc.description.abstractThe gathering of stakeholder requirements comprises an early, but continuous and highly critical stage in system development. This phase in development is subject to a large degree of error, influenced by key factors rooted in communication problems. This pilot study builds upon an existing theory-based categorisation of these problems through presentation of a four-dimensional framework on communication. Its structure is validated through a content analysis of interview data, from which themes emerge, that can be assigned to the dimensional categories, highlighting any problematic areas. The paper concludes with a discussion on the utilisation of the framework for requirements elicitation exercises.en
dc.format.extent396625 bytes-
dc.format.mimetypeapplication/pdf-
dc.language.isoen-
dc.publisherElsevier Scienceen
dc.subjectCommunicationen
dc.subjectRequirements elicitationen
dc.subjectContent analysisen
dc.titleCommunication issues in requirements elicitation: A content analysis of stakeholder experiencesen
dc.typeResearch Paperen
dc.identifier.doihttp://dx.doi.org/10.1016/S0950-5849(03)00032-6-
Appears in Collections:Computer Science
Dept of Computer Science Research Papers

Files in This Item:
File Description SizeFormat 
IST_MS-02-23_post-review copy.pdf387.33 kBAdobe PDFView/Open


Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.