Please use this identifier to cite or link to this item: http://bura.brunel.ac.uk/handle/2438/26656
Full metadata record
DC FieldValueLanguage
dc.contributor.authorYin, H-
dc.contributor.authorJin, Y-
dc.contributor.authorLi, L-
dc.contributor.authorLv, W-
dc.date.accessioned2023-06-16T08:59:26Z-
dc.date.available2022-10-31-
dc.date.available2023-06-16T08:59:26Z-
dc.date.issued2022-10-31-
dc.identifierORCID iD: Liang Li https://orcid.org/0000-0002-0451-7045-
dc.identifier8133-
dc.identifier.citationYin, H., et al. (2022) 'Numerical Investigation on the Impact of Exergy Analysis and Structural Improvement in Power Plant Boiler through Co-Simulation', Energies, 2022, 15 (21), 8133, pp. 1 - 19. doi: 10.3390/en15218133.en_US
dc.identifier.urihttps://bura.brunel.ac.uk/handle/2438/26656-
dc.description.abstractCopyright © 2022 by the authors.. In current power station boilers, fuel burns at a low temperature, which results in low exergy efficiency. This research combined the second law of t with the boiler structure to maximize the efficiency of a 350 MW power plant boiler. A three-dimensional simulation of the combustion process at the power plant boiler is performed. A one-dimensional simulation model of the boiler is then constructed to calculate the combustion exergy loss, heat transfer exergy loss, and boiler exergy efficiency. Under the principle of high-temperature air combustion technologies, this paper also proposes a new structure and improved operating parameters to improve the exergy efficiency of boilers by reducing the heat exchange area of the economizer and increasing the heat exchange area of the air preheater. Simulation results show that the exergy efficiency of the boiler increased from 47.29% to 48.35% through the modified model. The simulation outcomes can instruct future optimal boiler design and controls.en_US
dc.description.sponsorshipRoyal Academy of Engineering of the United Kingdom under the Newton Fund—the UK–China Industry Academia Partnership scheme (UK-CIAPP\201).en_US
dc.format.extent1 - 19-
dc.format.mediumElectronic-
dc.languageEnglish-
dc.language.isoen_USen_US
dc.publisherMDPIen_US
dc.rightsCopyright © 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).-
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/-
dc.subjectpower plant boileren_US
dc.subjectsecond low of thermodynamicsen_US
dc.subjectexergy efficiencyen_US
dc.subjectstructural developmenten_US
dc.titleNumerical Investigation on the Impact of Exergy Analysis and Structural Improvement in Power Plant Boiler through Co-Simulationen_US
dc.typeArticleen_US
dc.identifier.doihttps://doi.org/10.3390/en15218133-
dc.relation.isPartOfEnergies-
pubs.issue21-
pubs.publication-statusPublished-
pubs.volume15-
dc.identifier.eissn1996-1073-
dc.rights.holderThe authors-
Appears in Collections:Brunel Design School Research Papers

Files in This Item:
File Description SizeFormat 
FullText.pdfCopyright © 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).2.73 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons