Please use this identifier to cite or link to this item:
http://bura.brunel.ac.uk/handle/2438/24187
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Wang, H | - |
dc.contributor.author | Jia, Y | - |
dc.contributor.author | Lai, CS | - |
dc.contributor.author | Li, K | - |
dc.date.accessioned | 2022-02-26T10:52:12Z | - |
dc.date.available | 2022-02-26T10:52:12Z | - |
dc.date.issued | 2022-02-23 | - |
dc.identifier | ORCID iD: Chun Sing Lai https://orcid.org/0000-0002-4169-4438 | - |
dc.identifier.citation | Wang, H. et al. (2022) 'Optimal Virtual Power Plant Operational Regime under Reserve Uncertainty', IEEE Transactions on Smart Grid, 13 (4), pp. 2973 - 2985. doi: 10.1109/tsg.2022.3153635. | en_US |
dc.identifier.issn | 1949-3053 | - |
dc.identifier.uri | https://bura.brunel.ac.uk/handle/2438/24187 | - |
dc.description.sponsorship | National Natural Science Foundation of China (72071100); Guangdong Basic and Applied Basic Research Fund (2019A1515111173); Shenzhen Basic Research Program (JCYJ202103241044100-30); High-level University Fund (G02236002). | en_US |
dc.format.extent | 2973 - 2985 | - |
dc.language.iso | en_US | en_US |
dc.publisher | Institute of Electrical and Electronics Engineers (IEEE) | en_US |
dc.rights | Copyright © 2022 Institute of Electrical and Electronics Engineers (IEEE). Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works by sending a request to pubs-permissions@ieee.org. See: https://www.ieee.org/publications/rights/rights-policies.html | - |
dc.rights.uri | https://www.ieee.org/publications/rights/rights-policies.html | - |
dc.subject | uncertainty | en_US |
dc.subject | price-dependent offering strategy | en_US |
dc.subject | stochastic minimax regret | en_US |
dc.subject | secondary reserve | en_US |
dc.subject | self-adaptive | en_US |
dc.title | Optimal Virtual Power Plant Operational Regime under Reserve Uncertainty | en_US |
dc.type | Article | en_US |
dc.identifier.doi | https://doi.org/10.1109/tsg.2022.3153635 | - |
dc.relation.isPartOf | IEEE Transactions on Smart Grid | - |
pubs.issue | 4 | - |
pubs.publication-status | Published | - |
pubs.volume | 13 | - |
dc.identifier.eissn | 1949-3061 | - |
dc.rights.holder | Institute of Electrical and Electronics Engineers (IEEE) | - |
Appears in Collections: | Dept of Electronic and Electrical Engineering Research Papers |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
FullText.pdf | Copyright © 2022 Institute of Electrical and Electronics Engineers (IEEE). Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works by sending a request to pubs-permissions@ieee.org. See: https://www.ieee.org/publications/rights/rights-policies.html | 2.16 MB | Adobe PDF | View/Open |
Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.