Please use this identifier to cite or link to this item: http://bura.brunel.ac.uk/handle/2438/22791
Title: Two-stage optimal scheduling of air conditioning resources with high photovoltaic penetrations
Authors: Wang, D
Wu, R
Li, X
Lai, CS
Wu, X
Wei, J
Xu, Y
Wu, W
Lai, LL
Keywords: air conditioning resources;mixed integer linear programming;rolling horizon optimization;two-stage optimal scheduling
Issue Date: 12-Sep-2019
Citation: Wang, D., Wu, R., Li, X., Lai, C.S., Wu, X., Wei, J., Xu, Y., Wu, W. and Lai, L.L. (2019) 'Two-stage optimal scheduling of air conditioning resources with high photovoltaic penetrations', Journal of Cleaner Production, 241, 118407, pp. 1-14. doi: 10.1016/j.jclepro.2019.118407.
URI: https://bura.brunel.ac.uk/handle/2438/22791
DOI: https://doi.org/10.1016/j.jclepro.2019.118407
ISSN: 0959-6526
Appears in Collections:Dept of Electronic and Electrical Engineering Embargoed Research Papers

Files in This Item:
File Description SizeFormat 
FullText.pdfEmbargoed until 12 September 20211.36 MBAdobe PDFView/Open


Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.