Please use this identifier to cite or link to this item: http://bura.brunel.ac.uk/handle/2438/19826
Full metadata record
DC FieldValueLanguage
dc.contributor.authorNebrensky, J-
dc.coverage.spatialRutherford-Appleton Laboratory, Chilton, Oxfordshire, UK-
dc.date.accessioned2019-12-16T15:14:54Z-
dc.date.available2014-12-01-
dc.date.available2019-12-16T15:14:54Z-
dc.date.issued2014-
dc.identifier.urihttp://bura.brunel.ac.uk/handle/2438/19826-
dc.description.abstractPresentation on beamline issues at "MICE Transition to Operations" meeting with ISIS, 1st December 2014. Slides updated 8th December 2014. ("Hydraulics" is in brackets on slide 4, as the Beamstop's lifting table was already covered by an external support contract.)en_US
dc.language.isoenen_US
dc.titleMICE Muon Beamlineen_US
dc.typePresentationen_US
Appears in Collections:Dept of Electronic and Electrical Engineering Embargoed Research Papers

Files in This Item:
File Description SizeFormat 
FullText.pdfEmbargoed until 1/1/203090.57 kBAdobe PDFView/Open


Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.