Please use this identifier to cite or link to this item: http://bura.brunel.ac.uk/handle/2438/17422
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorRahman, M-
dc.contributor.advisorTai Wan, K-
dc.contributor.authorByzyka, Juliana-
dc.date.accessioned2019-01-29T14:15:24Z-
dc.date.available2019-01-29T14:15:24Z-
dc.date.issued2018-
dc.identifier.urihttp://bura.brunel.ac.uk/handle/2438/17422-
dc.descriptionThis thesis was submitted for the award of Doctor of Philosophy and was awarded by Brunel University Londonen_US
dc.description.abstractThe study focuses on the issue of hot mix asphalt pothole repairs, the performance of which is greatly reduced by repair edge disintegration. This is caused by low interface temperatures which result in low density interfaces and poor repair bonding. The study examined heat flow in shallow and deep pothole excavations under controlled pre-heating done in heating-cooling cycles, referred as “dynamic heating”, and the effect of asphalt thermal properties on this. Dynamic heating was applied with an experimental infrared heater operating between 6.6 kW and 7.7 kW heat power and with the heater being stationary or moving above simulated potholes at offsets of 130 mm and 230 mm. The study also examined heat flow in traditional non-heated shallow repairs, referred as “static repairs”, and dynamic shallow repairs and the effect of pothole pre-heating in repair adhesion. Finite Element modelling was also used to enhance understanding of heat flow in the executed repairs. Then, the bonding properties and rutting resistance of the repairs were assessed using shear bond tests (SBT’s) and wheel track tests (WTT’s) respectively. The results showed that irrespective of excavation depth, heating power and heater offset, temperature distribution in the pothole excavation and inside the slabs under dynamic heat was non-uniform. Dynamically heating pothole excavations for approximately 10 minutes yields better heat distribution than 20 minutes heating time while minimising the possibility of asphalt overheating. The temperature profile at the interface of the dynamically heated repair is improved when compared to static repair suggesting better interface adhesion. A significant role in this profile is played by thermal contact conductance which determines the resistance to pavement-repair thermal conduction per unit area at the repair interface. This was reflected in the assessment and simulation of the repairs with the latter generating reasonable transient temperature profiles within the dynamically heated pothole excavation, at the interface of the repairs, and inside the host pavement. Further, the shear strength at the bottom and side interfaces of dynamically heated repairs was 78.2% and 68.4% higher respectively than that of static repairs. On average, static and dynamic repairs showed repair interface rutting depths of 14.82 mm and 10.36 mm respectively. It was concluded that dynamically heating a pothole excavation increases repair interface adhesion and repair durability.en_US
dc.language.isoenen_US
dc.publisherBrunel University Londonen_US
dc.relation.urihttps://bura.brunel.ac.uk/bitstream/2438/17422/1/FulltextThesis.pdf-
dc.subjectAsphalt pavement failuresen_US
dc.subjectPothole repair interface disintegrationen_US
dc.subjectInfrared heaten_US
dc.subjectThermal finite element modellingen_US
dc.titleFundamental characterisation of thermal influence in hot mix asphalt repairen_US
dc.typeThesisen_US
Appears in Collections:Civil Engineering
Dept of Mechanical and Aerospace Engineering Theses

Files in This Item:
File Description SizeFormat 
FulltextThesis.pdf19.07 MBAdobe PDFView/Open


Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.