Search
Add filters:
Use filters to refine the search results.
Results 1-4 of 4 (Search time: 0.002 seconds).
- previous
- 1
- next
Item hits:
Issue Date | Title | Author(s) |
---|---|---|
2004 | A rework reduction model for construction projects | Love, PED; Irani, Z; Edwards, DJ |
2004 | Evaluating the integration of supply chain information systems: A case study | Themistocleous, M; Irani, Z; Love, PED |
2004 | An exploratory study of information technology evaluation and benefits management practices of SMEs in the construction industry | Love, PED; Irani, Z |
2004 | Integrating the IS with the enterprise: Key EAI research challenges | Sharif, A M; Elliman, T; Love, PED; Badii, A |
Discover
Subject