Please use this identifier to cite or link to this item: http://bura.brunel.ac.uk/handle/2438/14632
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMendes, E-
dc.date.accessioned2017-05-31T13:35:46Z-
dc.date.available2014-08-
dc.date.available2017-05-31T13:35:46Z-
dc.date.issued2014-
dc.identifier.citationSoftware Engineering and Advanced Applications (SEAA), 2014 40th EUROMICRO Conference on, 2014, pp. 285 - 292en_US
dc.identifier.urihttp://bura.brunel.ac.uk/handle/2438/14632-
dc.description.abstractBackground: In order to address the challenges in companies having no or limited effort datasets of their own, cross-company models have been a focus of interest for previous studies. Further, a particular domain of investigation has been Web projects. Aim: This study investigates to what extent effort predictions obtained using cross-company (CC) datasets are effective in relation to the predictions obtained using single-company (SC) datasets within the domain of web projects. Method: This study uses the Tukutuku database. We employed data on 125 projects from eight different companies and built cross and single-company models with stepwise linear regression (SWR) with and without relevancy filtering. We also benchmarked these models against mean and median based models. We report a case-by-case analysis per company as well as a meta-analysis of the findings. Results: Results showed that CC models provided poor predictions and performed significantly worse than SC models. However, relevancy filtered CC models yielded comparable results to that of SC models. These results corroborate with previous research. An interesting result was that the median-based models were consistently better than other models. Conclusions: We conclude that companies that carry out Web development may use a median-based CC model for prediction until it is possible for the company to build its own SC model, which can be used by itself or in combination with median-based estimations.en_US
dc.format.extent285 - 292-
dc.language.isoenen_US
dc.titleA comparison of cross-versus single-company effort prediction models for web projectsen_US
dc.typeArticleen_US
dc.identifier.doihttp://dx.doi.org/10.1109/SEAA.2014.41-
dc.relation.isPartOfSoftware Engineering and Advanced Applications (SEAA), 2014 40th EUROMICRO Conference on-
pubs.notesinterhash: 6303c0f5874610a9ca6860b21d52fa8e intrahash: 3d200f94062e8d4b788534e4eabf23af-
Appears in Collections:Dept of Electronic and Electrical Engineering Research Papers

Files in This Item:
File Description SizeFormat 
Fulltext.pdf238.44 kBAdobe PDFView/Open


Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.