Title: IEEE PES PowerAfrica 2017
Authors: Nwachukwu, T
Keywords: grid code;power;utility-scale solar farm;surge independance loading
Issue Date: 2017
Citation: 2017
Abstract: Upcoming construction proposals for utility-scale photovoltaic plants and discussion of compensation in Nigeria raise the question of appropriate grid code requirements to support system voltage control objectives. The large geographical extent, long lines, and small number of generators in the Nigerian High Voltage System make voltage control a critical issue. This paper evaluates the effect of different power control strategies for a 100 MW solar plant, using dynamic simulation of a detailed grid model. The choice of location in North of Nigeria informs ongoing discussions, and is the first published study of this type. The effect of the strategies are compared, and recommendations are made for transmission system operators and developers to consider as they define interconnection agreements.
URI: http://bura.brunel.ac.uk/handle/2438/14496
Appears in Collections:Dept of Mechanical and Aerospace Engineering Research Papers

Files in This Item:
File Description SizeFormat 
Fulltext.pdf2.47 MBAdobe PDFView/Open


Items in BURA are protected by copyright, with all rights reserved, unless otherwise indicated.